Main Specification:
- Contractor: Ghadir JV (Nasr Misagh ahvaz, Scetiran, Nardis)
- Scope: EPC
- Client: National Iranian Oil Engineering & Construction Co. (N.I.O.E.C)
- Location: This Pipeline is started from Sabzab Pump Station in Khoozestan Province and it will be ended in Tehran-Rey
Project Summary:
Engineering of Bushehr Petrochemical Project, Utility & Offsite units, Phases 2 &3 and engineering procurement support
Consist of:
- Sabzab / Ray Pipeline project with an approximate length of 620 kilometers to transport crude oil, crude oil field north of Dezful area of 450,000 barrels per day will be built.
- Execution of 120 km of 30-inch diameter pipeline with a capacity of 450,000 barrels per day from Sabzab Pumped Station to the Tange Fanni pump station.
- Execution of 239 kilometers of 26-inch diameter pipeline with a capacity of 295,000 barrels per day from Tange Fanni Pump Station to Shazand Pump station.
- Execution of 279 km of 18-inch diameter pipeline with a capacity of 105,000 barrels per day from Shazand Pump Station to Ray to Terminal.
- Generations are included of executions of six pumping stations Sabzab, Tange Fanni, Asar, Pole baba ,Razan & shazand as well as execution of Pressure reducing stations Namak and terminal facilities of Rey.
- In addition to above execution of 63 KV Over Head power Transmissions lines and electrical substations of respective stations in Sabzab, Tange Fanni and Asar